Nature Center ADA Ramp and Walk Repair Phase 2 (30476)
Nature Center ADA Ramp and Walk Repair Phase 2 (30476)
Start Date: 03/01/2025
End Date: 12/31/2026
Priority: High
Level of Effort: Medium
Level of Impact: Medium
Percent Complete: 75%
Current Status:
The project is currently on hold due to the presence of critical root structures from two trees that cannot be impacted in the proposed location of the ADA walkway connecting the Nature Center parking lot to the Paul LeTendre Pavilion. Alternative options are being explored.