Library redesign project
Library redesign project
Start Date: 08/01/2023
End Date: 12/31/2026
Priority: High
Level of Effort: High
Level of Impact: High
Percent Complete: 25%
Current Status:
The Library Redesign Project has been moving along smoothly. The Construction Manager and architecture/engineering firm worked through sub-contractor bid documents and posted the solicitation at the end of the quarter. Staff is waiting to receive bids. Hazardous materials testing will soon be taking place as well.