Nature Center ADA Ramp and Walk Repair Phase 2 (30476)
Nature Center ADA Ramp and Walk Repair Phase 2 (30476)

Start Date: 03/01/2025

End Date: 12/31/2026

Priority: High

Level of Effort: Medium

Level of Impact: Medium

Percent Complete: 75%

Current Status:

The project is currently on hold due to the presence of critical root structures from two trees that cannot be impacted in the proposed location of the ADA walkway connecting the Nature Center parking lot to the Paul LeTendre Pavilion. Alternative options are being explored.