Old Academy interior building renovation (30634)
Old Academy interior building renovation (30634)
Start Date: 02/01/2024
End Date: 12/31/2030
Priority: High
Level of Effort: High
Level of Impact: High
Percent Complete: 2%
Current Status:
Initial conceptual designs have been developed. This project has some overlap with the cupola restoration and reattachment project in terms of investigation being needed within the ceiling on the second floor. Scaffolding was erected to investigate within the second floor ceiling to determine the best way to proceed with HVAC and lighting improvements in addition to cupola reinstallation.
Legend:
Completed Previous Quarter |
Completed Last Quarter |
On Target |
On Hold |
Below Plan |
No Information